Before
Portsmouth Kitchen Remodel. We removed cabinets, countertops, patched the walls and prepped for new cabinets.
After
Portsmouth, Rhode Island
Kitchen after full renovation. Granite countertops, new cabinets, overhead lighting and paintwork.
Portsmouth House, Before
We begin demolition on this Portsmouth house in preparation for a complete redesign of the structure.
After Portsmouth, Rhode Island
Completed house with new siding, dormers, roof, porch, windows and trim.
Portsmouth House Before
On this house we removed the old siding, deck, porch and railing.
After
We installed new Hardi Board siding, new soffits, trim, new deck, railings and painted the exterior.
Spray Painting Kitchen Cabinets
Painting kitchen cabinets in Jamestown.
Newport Kitchen After
Finished product.
We build kitchens to any style.
Before
Here we have a picture of a house before renovations in Jamestown, Rhode Island.
After (Jamestown)
Jamestown house with new cedar shake siding, outdoor shower, added window trim and a newly painted exterior.
Before (Middletown, RI)
Photo of house before residing the east side of the house.
After (Middletown, RI)
After photo of newly shingled house in Middletown, RI.
Siding on Aquidneck Island
Removed old siding and replaced with cedar shake shingles.
Finished siding job on Aquidneck Island
New cedar shake shingles installed on Aquidneck Island.
New Balcony on a Portsmouth house.
Newly constructed balcony with custom support brackets.
Commercial Work
Initial stages of construction on an office space with metal studs and drop ceilings.
Part 2 of Commercial Office Space
Part 2 of Commercial Office Space, metal studs walls.
Part 3: New Office Space
New office space with drop ceilings.
Shower
Completely renovated bathroom with new shower base, decorative border and marble shelving.
Bathroom Before
Old phone booth style shower before renovation.
Bathroom
We opened up the shower by removing the wall. Custom shower base and tile work.
Out door shower construction
Building a new outdoor shower for the Jamestown house.
Outdoor shower.
Custom old style shower plumbing incorporating a pan shower head and a foot spout. With special drain plugs for winterising the shower.
Entrance to completed outdoor shower.
Completed outdoor shower.
Freshly painted wall and crown molding
New shower
Finished shower. Completely renovated bathroom with custom shower base, tile flooring, walls and half wall.
800 lb. cast iron soaking tub
Installation of tile and cast iron soaking tub in Jamestown, RI.